Sr. No.

Corrigendum / Minutes

Name of work

Estimated Cost(Rs.)

Earnest Money

Time Limit

Last date of sale of tender documents

Date & time of receipt of tenders

Date & time of opening of tenders

1.S/R by providing improvement on various road in Provincial Division, Nuh in Punhana Constituency Distt. Mewat (Group-VI)483.79 lacs9.68 lacs for Contractor & 4.84 lacs for Society9 (Nine) Months2015-09-27
upto 17:00
27/09/2015 17:00 hrs.29/09/2015 09:01 hrs.
2.Upgradation of various roads in Rewari District (i) Kosli Guriani to Palhawas (RD 0 to 16.712 KM.) (ii) Haily Mandi to Palhawas ( RD 9.040 to 12.650 Km)Rs. 3640.00 lacsRs. 72.80 lacs 09 (Nine) Months2015-08-31
upto 17:00
31.08.2015 17:00 Hrs02.09.2015 09:00 Hrs.
3.DNIT for Shifting of Ellenabad-Dholpalia-Masitan road upto Raj. Border in Km.10.550 to 10.726 (Regarding Court case of Sh. Tara Chand V/s State of Haryana) in Sirsa Distt.15.86 Lacs 0.32 Lacs from Contr. 0.16 Lacs from Society.Three Months2015-08-31
upto 20:00
31.08.15 upto 20:00 Hrs.01.09.15 17:01 Hrs
4.DNIT for Shifting of Ellenabad-Dholpalia-Masitan road upto Raj. Border in Km.10.550 to 10.726 (Regarding Court case of Sh. Tara Chand V/s State of Haryana) in Sirsa Distt.10.25 Lacs 0.20 Lacs from Contr. 0.10 Lacs from Society.Three Months2015-08-31
upto 20:00
31.08.15 upto 20:00 Hrs.01.09.15 17:01 Hrs
5.Repair of Kurukshetra Dhand road to Thanesar Pehowa road via Kamoda Lohar Majra with link to Khijjarpura in District Kurukshetra (Re-invited)Rs. 24.15 LacsRs. 0.50 Lacs/ Rs. 0.25 Lacs 06 Months2015-08-30
upto 17:00
30-08-2015 17.00 Hrs.01-09-2015 09.00 Hrs.
6.Special repair of VT roads under Head-3054(Village Roads) 6 Nos. Roads by providing Premix carpet (Road ID: 5855, 5930,5961,5881,5892, 5880) in Sirsa Distt. for the year 2015-2016156.65 Lacs3.14 Lacs from Contr.1.57 Lacs from Society.Three Months2015-08-31
upto 20:00
31.08.15 upto 20:00 Hrs.01.09.15 17:01 Hrs
7.Special repair of VT roads under Head-3054(ODR) by providing CCB/PC on 04 Nos. roads in Sirsa Distt. for the year 2015-2016 (Road IDs:5957, 5936, 5857 & 5858) (Constituency: Rania-44) 173.55 Lacs3.48 Lacs from Contr. 1.74 Lacs from Society.Three Months2015-08-31
upto 20:00
31.08.15 upto 20:00 Hrs.01.09.15 17:01 Hrs
8.Special repair of 8 Nos. Roads under Head 3054 R&B under Provincial Division No.1, PWD B&R, Kurukshetra (Road ID 7872, 7882, 7854,7848,7866,7845, 7834 and 7837) under work programme 2015-16 (Re-invited)409.00 Lacs8.20 Lacs Contr. 4.10 Lacs Society 8 (Eight) Months2015-09-01
upto 17:00
1.9.2015 17:00 hrs3.9.2015 17:01 hrs
9.House Keeping Services of Nirman Sadan Building with 10400 Sq.Meter covered area for one year. Rs.15.80 Lacs. Rs.15,800/- for Society & Rs.31,600/- for Contractor 12 (Twelve) Months2015-09-07
upto 17:00
07.09.2015-17:00 HRS.09.09.2015- 11:00 HRS.
10.Special repair of roads approved under Work Programme ODR 2013-14 under the jurisdiction of Constn. Divn. Chandigarh (VT).Rs.198.27 Lacs. Rs.3.97 for Contractor & Rs.1.98 Lacs for Society9 (Nine) Months.2015-09-07
upto 17:00
07.09.2015-17:00 HRS.09.09.2015- 11:00 HRS.
11.Special repair of road approved under Work Programme ODR 2015-16 under the jurisdiction of Constn.Divn.Chandigarh (OVT). Rs.351.85 Lacs. Rs.7.04 for Contractor & Rs.3.52 Lacs for Society12 (Twelve) Months.2015-09-07
upto 17:00
07.09.2015-17:00 HRS.09.09.2015- 11:00 HRS.
12.Security Guarding facility services of Nirman Sadan Building in Sector-33-A, Chandigarh with 10400 Sq.meter covered area for one year.Rs.22.51 Lacs. Rs.45,200/- for Contractor & Rs.22,600/- for Society 12 (Twelve) Months.2015-09-07
upto 17:00
07.09.2015-17:00 HRS.09.09.2015- 11:00 HRS.
13.Special Repair for work programme of ODRs for Premix Carpet for the year 2013-2014 of Provincial Division, PWD B&R Branch Fatehabad of Ratia Constituency (ID 5520 & 5502).Rs. 35.55 LacsRs. 0.70 Lacs Rs. 0.35 Lacs3 (Three) months.2015-09-03
upto 17:00
03.09.2015 upto 17:00 Hrs04.09.2015 upto 12:01 Hrs
14.Special Repair for work programme of ODR roads for the year 2013-2014 of Provincial Division, PWD B&R Br., Fatehabad in Ratia Constituency. (Road ID 5539, 5529, 5538, 5595 & 5633).Rs. 184.00 LacsRs. 3.68 Lacs / Rs. 1.84 Lacs9 (Nine) months.2015-09-03
upto 17:00
03.09.2015 upto 17:00 Hrs04.09.2015 upto 12:01 Hrs
15.Special Repair for work programme of ODR roads for the year 2013-2014 of Provincial Division, PWD B&R Br., Fatehabad in Fatehabad Constituency. (Road ID 5341, 5342 & 5352).Rs. 215.26 LacsRs. 4.32 Lacs / Rs. 2.16 Lacs9 (Nine) months.2015-09-03
upto 17:00
03.09.2015 upto 17:00 Hrs04.09.2015 upto 12:01 Hrs
16.Improvement of 6 Nos. roads under Provincial Sub Division No. 1, PWD B&R Br., Shahbad in District Kurukshetra under 5054 R&B (Group-I) (Road ID 8122, 8114, 8133, 8150, 8117, 8128) Rs. 147.15 LacsRs.2.96 Lacs / Rs. 1.48 Lacs 06 Months2015-09-03
upto 17:00
03-09-2015 17.00 Hrs.07-09-2015 09.00 Hrs.
17.Improvement of 7 No. roads under Provincial Sub Division No. III, Pipli in District Kurukshetra under Head 3054 R&B ODR (Group-II) (Road ID 8001, 8033, 8034, 8049, 8063, 8008, 8040)Rs. 147.25 LacsRs. 2.96 Lacs for Contractor Rs. 1.48 Lacs for Societies05 Months2015-09-06
upto 17:00
06-09-2015 17.00 Hrs.08-09-2015 09.00 Hrs.
18.Improvement of 10 Nos. roads under Provincial Sub Division No. 1, PWD B&R Br., Shahbad in District Kurukshetra under 3054 R&B (Group-II) (Road ID 8109, 8111, 8112, 8138, 8139, 8148, 8149, 8123, 8104, 8127) Rs. 166.33 LacsRs.3.32 Lacs / Rs. 1.66 Lacs 06 Months2015-09-03
upto 17:00
03-09-2015 17.00 Hrs.07-09-2015 09.00 Hrs.
19.Special repair of 42 Nos. Other District Roads (ODR) in Provincial Division No.II, PWD B&R Br., Kurukshetra by way of patch work and surface treatment (Premix Carpet)-Condition Survey.(2013-14).Rs. 349.62 LacsRs.7.00 Lacs / Rs. 3.50 Lacs 06 Months2015-09-03
upto 17:00
03-09-2015 17.00 Hrs.07-09-2015 09.00 Hrs.
20.Improvement of 2 No. roads under Provincial Sub Division No. III, Pipli and Provincial Sub Division No. I, Shahabad under SCSP Scheme in District Kurukshetra (Road ID 8099 & 8027)Rs. 374.00 LacsRs. 7.48 Lacs / Rs. 3.74 Lacs 08 Months2015-09-06
upto 17:00
06-09-2015 17.00 Hrs.08-09-2015 09.00 Hrs.
21.Special repair of 4 Nos. VT ODRs roads by Providing CCB/Stg. in Provl. Division No.II, Sirsa in Sirsa Distt. under HOA 5054 R&B(Plan) under approved work programme 2015-16 (Road ID:5967,5970, 5983, 5816) (Constituency- Sirsa-45 ). (Re-invited) 430.00 Lacs8.60 Lacs from Contr. 4.30 Lacs from Society.Eight Months2015-09-03
upto 20:00
03.09.15 upto 20:00 Hrs.05.09.15 17:01 Hrs
22.Special repair of VT roads under Head-5054 ODRs 3 Nos. roads by Providing Premix carpet approved in Work Programme 2015-16 in Sirsa Distt. (Provl. Division No.II,Sirsa (Road ID:5838, 5846,5905)(Re-invited)85.70 Lacs 1.72 Lacs from Contr. 0.86 Lacs from Society.Three months2015-09-03
upto 20:00
03.09.15 upto 20:00 Hrs.05.09.15 17:01 Hrs
23.DNIT for Special repair of VT roads under Head 3054 ODR 8 Nos. Roads by providing CCB/CCP ( Road ID 5885,5986,5859,5985,5873, 5984,5835,5861) in Sirsa Distt Approved in Work Programme for the year 2015-16. ( Constituency :- Sirsa-45) (Re-invited) 150.00 Lacs3.00 Lacs from Contr. 1.50 Lacs from Society.Three Months2015-09-03
upto 20:00
03.09.15 upto 20:00 Hrs.05.09.15 17:01 Hrs
24.Special Repair by providing Improvement of various roads in Provincial Sub Division No. 2, PWD B&R Br., Faridabad [ Group-IV of work programme for the year 2015-16 ] (i) Bhatola to Barauli [ Road ID : 3239] (ii) Link road to Bhupani [ Road ID: 3250 ] (iii408.40 Lacs408500/- 817000/- 06 Months2015-09-07
upto 17:00
07.09.2015 17.00 hours09.09.2015 10.00 hours
25.Special Repair by providing improvement of various roads in Provincial Sub Division No. 3, PWD B&R Br., Faridabad [ Group-IX of work programme for the year 2015-16 ] (i)Link road to Kot [ 3306 ] (ii)Link road to Bijupur [ 3295 ] (iii)Link road to Baajri 219.30 Lacs2.20 Lacs 4.40 Lacs06 Months2015-09-07
upto 17:00
07.09.2015 17.00 hours09.09.2015 10.00 hours
26.Special Repair by providing improvement of various roads in Provincial Sub Division No. 3 PWD B&R Br., Faridabad [ Group-VII of work programme for the year 2015-16] (i)Ferozpur Kalan to Jakupur [ Road ID : 3291] (ii)Bijupur to Jakupur [ Road I368.34 Lacs3.69 lacs 7.38 lacs06 Months2015-09-07
upto 17:00
07.09.2015 17.00 hours09.09.2015 10.00 hours
27.Special Repair by Improvement of various roads in Provincial Sub Division ,PWD B&R Br., Ballabgarh [ Group-VIII of work programme for the year 2015-16 ] (i)Sikri to Piyala road [ Road ID : 3331] (ii)Link road to Jajru [ Road ID : 3338 ] (iii)Ballabgarh t364.00 Lacs3.64 Lacs 7.28 Lacs06 Months2015-09-07
upto 17:00
07.09.2015 17.00 hours09.09.2015 10.00 hours
28.Special repair of 9 Nos existing roads in Rai and Ganaur Constituency (Approved of Work Programme for the year 2015-16) in Sonepat Distt (Road ID 6102, 6066, 6075, 6103, 6025, 6049, 6068, 9823, 6001)250.62 Lacs2.51 Lacs / 5.02 Lacs08 (Eight) Months2015-09-07
upto 16:00
07.09.2015-16:0009.09.2015-10:00
29.CONSULTANCY SERVICES FOR PREPARATION OF ESMS FOR CONSTRUCTION OF ELEVATED ROAD ON NH-10 FROM CHHOTU RAM CHOWK TO OLD BUS STAND (FROM KM. 74.100 TO 75.860 IN ROHTAK TOWNRate to be quoted by agency20000.00Two months2015-08-28
upto 13:00
28.08.2015 Time _13.00 Hours28.08.2015 Time 15.00 Hours
30.TP-27 [Rohtak- Kharkhauda- Delhi Border Road (Near Delhi Border)]Rate to be quoted by bidderRs. 9.70 lac18 (Eighteen) Months2015-09-02
upto 17:00
02.09.2015, 17:00 hrs.04.09..2015, 11:00 hrs.
31.4-Laning Jhajjar Farrukhnagar Gurgaon road Km 0.00 to 21.300 in Jhajjar/Gurgaon District. Rs.81.80 crore Rs. 163.60 lacs15 Months2015-10-05
upto 17:00
05.10.2015 upto 05:00 PM07.10.2015
32.Work of periodical renewal (PR) of new NH-148B from Km. 84.820 to 115.610 in the State of Haryana.Rs. 619.69 lacs Rs. 6.20 lacs for Societies Rs. 12.40 lacs for Contractors06 (Six) Months2015-09-06
upto 10:00
06.09.2015 10:00 Hrs.08.09.2015 10:00 Hrs.
33.Renovation/Furnishing of Haryana MLA Hostel in Sec.-3 & 4, Chandigarh. (Pdg. LAN System)Rs. 2.71 LacsRs. 5,500/- for Contractor & Rs. 2,750/- for Society3 (Three) Months 2015-08-30
upto 17:00
30.08.2015 17:00 hrs01.09.2015 14:01 hrs
34.Renovation/Furnishing of Haryana MLA Hostel in Sec.-3 & 4, Chandigarh. (Pdg. EPABX System) Rs. 2.57 LacsRs. 5,200/- for Contractor &Rs. 2,600/- for Society3 (Three) Months 2015-08-30
upto 17:00
30.08.2015 17:00 hrs01.09.2015 14:01 hrs
35. Re-INVITING OF TEBDER FOR THE WORK Rendering GRIHA Consultancy Services for construction Head Office Building for the Directorate of Industrial Training, Haryana, Sector-3 Panckhula.Rs. 8.00 LacsRs. 20000/- 24 (Twenty four) Months2015-08-31
upto 17:00
31.08.2015 17.00 hours1.09.2015 13.00 hours
36. TP-12 [Yamuna Nagar-Radaur-Ladwa-Thanesar road (at Km 40 near Yamuna Nagar)]Rate to be quoted by agencyRs.62.40 lacs18 months2015-08-30
upto 17:00
30-8-2015 17.00 hours01.09.2015 10.00 hours
37.CONSTRUCTION OF 5 11 1/2 HEIGH STAGGERED BOUNDARY WALL AROUND BHANKARI STORE ON GURGAON FARIDABAD ROAD TO PALI AT RD 0.90 K.M. IN FARIDABAD DISTRICT. 20.40 lacs21000/- 41000/-4 Months2015-09-14
upto 17:00
14.09.2015 17.00 hours16.09.2015 10.00 hours
38.Improvement by providing Strengthening CC Block and Side Drain on various roads (5 nos. Roads) under head 5054 R and B (Plan) in work programme 2015 2016 in Provincial Sub Division No.II, Rewari (Road ID 1521, 1578, 1558, 1562, 1611) (Re invited) Rs. 261.33 lacs Rs. 5.22 lacs for Contractor & Rs.2.61 lacs for Society06 (Six) months2015-09-16
upto 17:00
16.09.2015, 17.00 hrs18.09.2015, 9.00 hrs
39.Improvement of road by providing Strengthening CC Block M 30 CCP and Side Drain on 8 nos. ODR s under head 3054 in Provl. Division Rewari in Rewari Distt. (Road ID 1341, 1662, 1491, 1493, 1579, 1564, 1333 and 9994) (Re invited) Rs. 391.51 lacsRs. 7.84 lacs for Contractor & Rs.3.92 lacs for Society08 (Eight) months2015-09-16
upto 17:00
16.09.2015, 17.00 hrs18.09.2015, 9.00 hrs
40.Special repair of various roads under Jagadhri Provl. Divn. PWD B&R Br Yamuna Nagar under head N-51-08-3054-04-ODR-337-98-51-18 in Yamuna Nagar (Road ID 395, 634,512, 632, 429, 431)326.00 Lacs3.26 Lacs 6.52 Lacs09 Months2015-09-06
upto 17:00
06.09.2015 17.00 hours08.09.2015 10.00 hours
41.Special repair of various roads under Jagadhri Provl. Divn. PWD B&R Br Yamuna Nagar under head 3054 ODR in Yamuna Nagar (Group-7 (Road ID 422,411,396,408,402,398,412, 469,482, 488 & 481)392.50 Lacs3.93 Lacs 7.86 Lacs09 Months2015-09-06
upto 17:00
06.09.2015 17.00 hours08.09.2015 10.00 hours
42.Special repair of various roads under Jagadhri Provl. Divn. PWD B&R Br Yamuna Nagar (Under head N-51-08-3054-04 ODR-337-98-51-18 in Yamuna Nagar District (Group-12) (Road ID 533, 598, 514, 583, 440, 579,584, 577, 545 & 604)395.00 Lacs3.95 Lacs 7.90 Lacs09 Months2015-09-06
upto 17:00
06.09.2015 17.00 hours08.09.2015 10.00 hours
43.Special repair of various roads under Jagadhri Provl. Divn. PWD B&R Br Yamuna Nagar (under head N-51-08-3054-04-ODR-337-98-51-18) in Yamuna Nagar District (Group-10) (Road ID 707,733,732,735, 722,736, 680, 686,657 & 667)415.00 Lacs4.15 Lacs 8.30 Lacs09 Months2015-09-06
upto 17:00
06.09.2015 17.00 hours08.09.2015 10.00 hours
44.Special repair of various roads under Jagadhri Provl. Divn. PWD B&R Br Yamuna Nagar (under head N-51-08-3054-04-ODR-337-98-51-18) in Yamuna Nagar District (Group-8) (Road ID 495,474,471,468, 450,447, 499,490,477 ,480,472 and 691)370.00 Lacs3.70 Lacs 7.40 Lacs09 Months2015-09-06
upto 17:00
06.09.2015 17.00 hours08.09.2015 10.00 hours
45.Improvement of road by way of stg.on Madina to Kalanaur from km 6.00 to 9.00 in Rohtak Distt.Rs. 288.40 LacsRs. 288400 /- for Society & Rs. 576800 /- for contractorThree Months2015-09-14
upto 11:00
14-09-2015 (11:00 Hrs)14-09-2015 (17:00 Hrs)
46.Work of periodical renewal (PR) of new NH-148B from Km. 115.610 to 129.77 in the State of HaryanaRs. 286.43 lacs Rs. 5.72 lacs for Societies Rs. 2.86 lacs for Contractors06 (Six) Months2015-09-09
upto 10:00
09.09.2015 10:00 Hrs.10.09.2015 10:00 Hrs.
47.Construction of balance work of Widening and strengthening of Siwani-Singhani Road (SH N0. 19) from Km. 59.36 to 87.36 except Km. 78.66 to 79.06 and 80.56 to 81.36 in Bhiwani Distt. (Under CRF Scheme) in Bhiwani Distt (Under CRF Scheme)Rs.9.13 Crores Rs. 9.13 lacs for Societies Rs. 18.26 lacs for Contractors12 (Twelve) Months2015-09-04
upto 17:00
04.09.2015 17:00 Hrs.07.09.2015 11:30 Hrs.
48.Special repair of 2 No Roads (ID 568,582) under Provl. Sub Division No I PWD B&R Br Yamuna Nagar by providing premix carpet in Yamuna Nagar District 17.70 lacs 0.18 Lacs 0.36 Lacs03 Months2015-08-30
upto 17:00
30.08.2015 17.00 hours01.09.2015 10.00 hours
49.Improvement of Gijji to Bhainsru in Rohtak District139.30 Lacs278600/- for contractor & 139300/- for Society.6 (Six) Months2015-09-16
upto 11:00
16-09-2015 (11:00 Hrs)17-09-2015 (11:00 Hrs)
50.4-Laning Jhajjar Farrukhnagar Gurgaon road Km 0.00 to 21.300 in Jhajjar/Gurgaon District. Rs.81.80 croreRs. 163.60 lacs15 Months2015-10-05
upto 17:00
05.10.2015 upto 05:00 PM07.10.2015 at 10:00
51.A/S for providing surface dressing using pre-coated aggregate with bitumen renewal / subsequent coat & patch work on G.A. road to Sulela Km. 0.13 to 1.10 & 1.20 to 3.30 in Mewat Distt. (Road ID 1168)14.63 lacs29300/- for Contractor & 14650/- for Society2 (Two) Months2015-09-06
upto 17:00
06/09/2015 17:00 hrs.07/09/2015 09:01 hrs.
52.S/R by providing 20mm thick premix on various road in Provincial Division, Nuh Distt. Mewat (Group-VIII)59.93 lacs1.20 lacs for Contractor & 0.60 lacs for Society6 (Six) Months2015-09-06
upto 17:00
06/09/2015 17:00 hrs.07/09/2015 09:01 hrs.
53.Providing strengthening of Kala Amb Sadhaura Barara Shahbad Road (SH-04) in Yamuna Nagar Distt. (ID 743) 509.00 Lacs10.18 Lacs Contr. 5.09 Lacs Society 4 (Four) Months2015-09-14
upto 17:00
14.09.2015 upto 17.00 Hrs.16.9.2015 10:01 Hrs. to